AT90ADCPOD step by step configuration
Device specific settings
AT90S2323 running on external clock
- Connect your target application to the pod card using the 20 lead
probe cable inserted in connector marked 2323 2343.
- Use the 2 wire cable to connect J307 and J103.
Connect the pins labeled with * with each other.
- Leave jumpers J305, J306, J308 and 309 unconnected.
- Jumper J104 and connectors marked ADC, ADC28 and ADC40 are insignificant.
- Jumper marked PB3 and PB4 must both be in position OFF.
- Jumper marked RST must be in position ON.
Your pod card is now properly configured.